Recently, the main cable of Zhenyi Pavilion in Donghu Park, Tai'an City, malfunctioned, causing power outages in the Lotus Pond and South Square areas. The staff of the Tai'an City Garden Center Park Management Office carried out overnight repairs to restore power to the park in the shortest possible time, ensuring the safety of citizens visiting the park.
After the malfunction occurred, the park quickly activated the emergency plan and immediately arranged for professional electricians to investigate and deal with it. Due to the cable being deeply buried underground, the existing equipment could not find the breakpoint. The park fully utilized the wisdom and strength of its staff to further optimize the repair plan, actively contacted the power supply department for support, and with the help of a cable fault tester, braved the scorching heat and mosquito bites. After three hours of continuous fighting until 9 pm, the short circuit point was finally found and the cable was connected, ensuring the normal operation of the facility.
This cable repair operation not only saved a lot of maintenance costs for the park management, but more importantly, demonstrated the unity, cooperation, and innovative spirit of the park management team. Through practical actions, it has been proven that as long as there is determination and wisdom, solutions can be found in the face of difficulties, achieving the goal of saving expenses, reducing consumption, and improving quality and efficiency.
(Reported by Cao Rufeng, reporter and correspondent Zhang Min from Dazhong Daily and Dazhong News Client)